Telephone Whatsapp Get an Offer E-mail
REFERENCES

Salt Room Construction

Spa & Wellness Consultancy

Pool Maintenance

Thermal Pool Construction

Pond Pool Construction

Aqua Park Construction

E-Catalog
Get an Offer
FAQ
Answer to All Questions You Have in Your Mind
Is there something on your mind?
01
How long does the pool construction process take?

The duration of the pool construction process can vary depending on the type of pool, its dimensions, the materials used, and weather conditions. On average, building a pool can take between 4-12 weeks.

02
What are the costs of pool construction and what factors affect them?

The costs of pool construction can vary depending on factors such as pool type, size, materials used, equipment, labor, and additional features. You should consider your budget and evaluate the most suitable options for your project.

03
How should I determine the size and shape of my pool?

The size and shape of your pool depend on factors such as land size, intended use, aesthetic preferences, and budget. By consulting with experts, you can determine the most suitable size and shape for your pool.

04
Which surface material (plaster, tiles, mosaic, glass) should I choose for my pool, and why?

The surface material impacts the durability, maintenance requirements, and appearance of the pool. Plaster is cost-effective and durable; tiles and mosaic are more luxurious and customizable; glass offers a modern and glossy look. You should choose the most suitable surface material based on your budget and preferences.

05
What should I pay attention to during pool construction?

During pool construction, you should pay attention to factors such as site analysis, quality of materials and equipment, workmanship, safety, and energy efficiency.

06
How can the necessary permits for pool construction be obtained from the municipality?

The necessary permits for pool construction vary depending on the regulations of local authorities. You need to apply to the municipality by preparing the construction permit, site plan, and other required documents. As Çilek Havuz, we assist you in obtaining the necessary permits during this process.

07
Why is soil study and land analysis important for pool construction?

Soil study and land analysis determine factors such as the durability, drainage, accessibility, and safety of the pool. These analyses are important for the successful completion of our projects and help prevent potential issues.

08
Which filtration system (sand, cartridge, saltwater) is most suitable for my pool and why?

Sand filters are generally economical and effective, while cartridge filters are more energy-efficient and require easier maintenance. Saltwater filters, on the other hand, offer reduced chemical usage and provide soft water. You should choose the most suitable filtration system based on your needs and budget. We are ready to answer any further questions you may have during this process

09
How long is the lifespan of my pool equipment, and when should I replace them

The lifespan of pool equipment varies depending on usage frequency, maintenance, and manufacturer's recommendations. Pump and filter systems generally last around 7-10 years, heaters last 10-15 years, vinyl liners last 10-15 years, and concrete pool surfaces last 10-20 years. When the equipment's performance starts to decline or it requires frequent repairs, our team of experts can provide the necessary support.

10
How should I change the water in my pool and how often should I do it regularly?

The frequency of changing pool water depends on the type of pool, frequency of use, and water quality. Generally, pool water should be changed every 3-5 years. Regular water testing and maintenance will help determine the need for water replacement.

Header 1

Be the first to hear about new developments !

Leave
Join
Send